  • Turtle Cove Water Department Daily Work Log

  • - -
  • DAILY PROCEDURES

  • Analyze Water Tower liquid levels, usage rates, pressure, operating voltage, AC/DC status, SCATA system health. This will determine how many wells need to be operational to stabilize water level in water tower for that day to coincide with projected usage. This is a manual process. No SCATA control on wells. This is monitored throughout the day and modified, as needed.

  • :
  • Run Wells- Start up pumps, check for system leaks, examine system components, examine exterior for grounds maintenance requirements. Number of wells started is dependent on projected daily usage to keep tower water level and press sufficient.

  • :
  • Check for locates for the day and schedule.

  • :
  • Locate water lines to prevent line damage from digging

  • :